Skip to content
GroundLense
OverviewContact us

The platform

Everything, verified at the source.

Real-time entry

Field App on Site

The field team enters SPT data and soil descriptions on a phone — instantly. GPS coordinates and timestamps are captured automatically with every entry. No paper, no manual transcription, no Excel.

GPS verified

Actual Location Locked

The exact GPS coordinates of the boring are recorded the moment it begins. If the team moves from the planned location, the system flags the deviation and updates the RL automatically.

Verified

Depth Verified

Every SPT interval is timestamped as it happens. The actual depth advanced is logged against the depth on record — any discrepancy is visible before the invoice is approved.

Traceable

Sample Tracking

Every sample gets a unique digital ID at the moment of collection — linked to boring, depth, and timestamp. The NABL lab receives the same ID. No mixing, no smudged labels, no guessing.

Live feed

Live Monitoring Portal

Watch every boring as it happens from your office. Status, depth, active team, GPS location — updating in real time. The 14-to-21-day delay is replaced by instant visibility.

Stored forever

Permanent Data Vault

Every boring is stored securely, indefinitely. Three or five years later, when a new project needs the same subsurface data, it’s retrievable instantly — no re-investigation, no rebuilding from scratch.

The same investigation.
A completely different outcome.

ParameterManual Geotech AgencyGroundLense
Boring start to design finalization✕14–21 days of manual compilation✓Data ready instantly as boring completes
Data availability after 3–5 years✕Files lost — re-investigation needed✓Stored permanently, retrievable anytime
Actual depth vs recorded depth✕No verification — recorded as claimed✓GPS-verified actual depth on record
Live data monitoring✕None — phone calls and WhatsApp only✓Real-time portal from your office
Team presence on site✕Unverifiable✓GPS-confirmed team presence
SPT test intervals executed✕Cannot confirm if or when done✓Timestamped proof per interval
Data authenticity✕Editable Excel — no proof of original✓Tamper-proof SHA-256 chain
Risk of data loss✕High — work done, data gone✓Zero loss — every boring preserved
Boring start to design finalization
✕14–21 days of manual compilation
✓Data ready instantly as boring completes
Data availability after 3–5 years
✕Files lost — re-investigation needed
✓Stored permanently, retrievable anytime
Actual depth vs recorded depth
✕No verification — recorded as claimed
✓GPS-verified actual depth on record
Live data monitoring
✕None — phone calls and WhatsApp only
✓Real-time portal from your office
Team presence on site
✕Unverifiable
✓GPS-confirmed team presence
SPT test intervals executed
✕Cannot confirm if or when done
✓Timestamped proof per interval
Data authenticity
✕Editable Excel — no proof of original
✓Tamper-proof SHA-256 chain
Risk of data loss
✕High — work done, data gone
✓Zero loss — every boring preserved
IS-code certifiedBuilt by practising highway engineersGPS-verified every entryTamper-evident record
GroundLense
Proof, not promises.
Contact
info@groundlense.com+91 92181 07330WhatsApp
Registered office
Groundlense Technologies Private LimitedGurugram, Haryana
Legal
Terms of ServicePrivacy PolicyRefund PolicyCookie PolicyDelete my account
© 2026 Groundlense Technologies Private Limited. All rights reserved.
Talk to an expert